HFI acted as the prime contractor for the Simtra Chiller Replacements, overseeing equipment removal, installation, and water piping modifications. HFI self-performed the mechanical aspects of the project, including chilled water and tower water piping modifications, while subcontractors managed the construction of a new electrical building and handled piping insulation.
This 10,000-square-foot renovation project included the installation of two 800-ton chillers, a single 800-ton heat exchanger, two 2,200 GPM condenser pumps, and three 1,000 GPM chilled water pumps. HFI’s expertise in equipment handling and piping modifications ensured a seamless upgrade for the facility’s cooling capabilities.